Çamlıca I HES
On November 5, 2021, we added Çamlıca I Hydroelectric Power Plant to our portfolio with a licensed capacity of 84 MWe/94.5 MWm. It is the second largest hydroelectric power plant in Kayseri.
Diyarbakır Energy Storage SPP
The solar power plant consists of a capacity of 93 MWe/130,746 MWm and includes energy storage of 94 MWe/94 MWh (as a result of the application made under the fourteenth paragraph of the twelfth article added to the EPLY on 19.11.2022).
Gongele HPP
The power plant located in Çayarası area of Alanya was commissioned in the year 2021. The power plant has a capacity of 4.31 MWe/4.45 MWm.
Unlicensed Solar Power Plants in Diyarbakır.
A total of 11 unlicensed power plants with a combined capacity of 12,414.6 kWp are clustered in three different locations in the Çermik and Ergani districts of Diyarbakır. These power plants were commissioned in February/March of 2019.
Cojani 2 SPP
On December 23, 2024, we commissioned our Cojani 2 SPP facility located in Targu Carbuneşti – Gorj, Romania.
The plant operates with a 20.24 MWp Solar Energy Plant (SEP) and a 3.05 MWh Battery Energy Storage Plant (BESS).